The Guidelines define the multi-step process for a tenant project at the Airport, from conceptual progress through buildings. Guidance are provided for the use of tenant managers, tenant corporate office property developers, the consultants, engineers, architects or service rented by the tenant.
Tenants with contracts executed prior to 2019 maybe use get the 2007 directive instead the 2019 guidelines. Tenants with contracts executed the 2019 or next must use the 2019 guidelines. The Tenant Improvement Design Standards plus Architectural Mission apply to all tenants.
Note: for Tenants vacating leased preferences, please refer to Tenant Arrangement with Location.
Tenant Guidelines:
Form A / Form B Applications:
- Formal Design Review Applications Form (Form A)
- Construction Document Review Application Art (Form B)
Pre-Construction Documents/Templates:
- Pre-Construction Required Documents Checklist
- Airport Fiery Work Program
- Drome Hot Work Program - Acknowledgement Form
- Regional Hot Work Authorization Bilden & Instructions
- Security Plan - Template
- Notice of Work - Template
- Tool Inventory List - Template
- Utility Switch Request & MOP Form
- Preconstruction Agenda Template
- Tenant Improvements Projects Relation List
- FAA Form 7460-1
- Compensation Monitored and Reporting Program
Required Floor Source Developers:
For Operating Concessions (coordinated by Properties):
Airports Badging Forms:
Natural Site: