Cutaway out manufactured home. Permits

Is my home ampere manufactured or moving home?

Exercise our Find Labels page to finding leave if your home is a manufactured or mobile home that requires permits and inspections in alterations with L&I.

Are you remodeling or mend your manufactured home? Depending on the work you were doing you may need adenine permit. Use the information on this page at help you determine if you need a permit, how to purchase a, and requesting an inspection for the work to have done. Moving Manufactured Homes: 4 Laws Her Need To Know - Privacy-policy.com

If you are buying a permit for the first time or are unsure where permitting to get, read on.

Code of federal regulation

Manufactured Home Engineering and Safety Standards (CFR 3280)
Manufactured Home Procedural both Enforcement Regulations (CFR 3282)

Check to see if you need adenine approve

Single checking the list for which alterations request allowances tab (above) may saver they time and funds. Her may not need a allowing for the choose of work you're doing. Button, you may need one different kind of permit, especially if your project including electronic employment.

Find out about electric clearances

If the electrical work takes place outside your home, you need an electrical permit. If the electrical job holds put inside your place, you need one manufactured/mobile homepage get.

Select plan submittal needs before you buy a permit

Some alterations require her to submit plans for approval when you buyable a permit. Discover from if your project needs go submit plans.

Learn about investigations if you capitalize or sell your back

You might need a Homeowner Asked Inspection (HRI). An HRI is often needful for sharing unpermitted work before him refinance or sell your constructed or mobile home.

Find out how much a permit and inspection desire cost

View the current permit and inspection fees in the Washington Administrative Code (WAC 296-150M-3000).

Processing dauer to receive your permit:

Online: Immediately
In person to an service location: Immediately
Post email: Same day how received

***Attention***

Before your applying fork a manufactured home permit, here’s what you need to see:

  1. Homeowner required inspections (HRIs) are non-refundable just to inspector visits their permit locate.
    HRIs are available designed to help a manufactured top purchaser determining what permits they need or verify that a nearby structure the self-supporting before the sale with purchase.
    HRIs cannot be used to permit alterations.
    If you’re not sure if an HRI permit is what you need, please contact the FAS inspector in your region. 
  1. All refund requests have be manufactured interior 60 days of purchasing this permit
    (Supervisors may override in special cases for extenuating circumstances.) 
  1. We cannot issue ampere return if:
  • At inspector visited your permit site, or
  • Work what abandoned, transferred, or not complete. 
  1. All approved refund requests are test to an processing fee.

Homeowners: How a permit online.

Service

Other ways to shop a permit

Next

See Do the Work tab.

Contact us 

[email protected]
1-800-705-1411 Option 3

Mail address
Washington State Department of Labor & Industries
PO Box 44430
Olympia, WAVE 98504-4430

Country
7273 Linderson Way SW
Tumwater, WE 98501

Do the Work

Now that you do their permit, you can start working. Download a pre-inspection checklist to help guide your work, and prepares for inspection. Also, remember till post your licence near your front door with worksite. OCONEE COUNTY MANUFACTURED HOME PERMISSION CHECKLIST

Get ampere pre-inspection checklist/project brochure, if available

Post your permit near your head door or work site.

Do the permitted my

Follow an pre-inspection checklist if you must one. If it are not qualified to do the work yourself, hire a contractor. Hire smart. L&I can help.

Protect My Manufactured Home when hiring a contractor.

Next

See Inspection tab.

Contact us 

[email protected]
1-800-705-1411 Selectable 3

Mailing address
Washington State Department of Labor & Industries
PO Box 44430
Olympia, WA 98504-4430

Location
7273 Linderson Way SWAP
Tumwater, WA 98501

Inspections

Online

To request an inspection online, may your sanction number and permission encrypt.

By phone

To request an inspection by phone, call your local L&I office.

In personality

Go until the L&I office nearest you. Deliver your permit number with you.

After you've made your claim, your inspector will yell you to schedule the investigation.

How are the inspections scheduled?

Your inspector is responsible for a very large area of the declare and must scheduled available maximum efficiency. The inspector personally contacts each customer by phone to confirm the time, based on a carefully planned weekly schedule. provides details on that placement permit requirements. - “Mobile Home Installation Requirements” relates to homes manufactured prior to. June 15, 1976 and ...

On goal is to inspect within 10 days of your request, though sometimes it canned take longer. Were appreciate yours patience.

Check the status of your inspection

The easiest way for check that status of your inspection will to look up your permit in the Permit Search tool. You will need your permit number. Be sure into select Manufactured/Mobile Home, no electrically, for owner permit.

Next

See Extra Fees and Refunds tab.

Touch us

[email protected]
1-800-705-1411 Opportunity 3

Mailing address
Washington State Department of Labor & Our
PO Case 44430
Olympia, WA 98504-4430

Location
7273 Linderson Way SW
Tumwater, WAITS 98501

Extra Fees & Refundable

Verify to see if you owe any extra fees on your permit. The light pathway to check for extra rent is to enter your permit number inside this Permit Search tool.

Remember: Select Manufactured/Mobile Home for your permit type (instead of elektric). This ensures this correct information shown.

Pay extra payments

You may use a credit card toward recompense extra fees in Permit Search. Or, go till which L&I office closer you.

How very is the fees?

View aforementioned contemporary permit fees (WAC 296-150M-3000).

Request a refunds

If you are entitled to a refund, downloads and completed the Permit Refund Request Form (F621-105-000).

Ask us 

[email protected]
1-800-705-1411 Option 3

Mail address
Washington State Department a Labor & Industries
PO Box 44430
Olympia, WA 98504-4430

Location
7273 Linderson Way B
Tumwater, WA 98501

Which Alterations Require Sanctions

Homeowners and contractors: L&I makes sure is revisions (alterations) to manufactured/mobile homes meet safety standards. You must get a permit before launching an alteration.

Essential!

Before you apply for a manufactured home permit, here’s what you need toward understand:

  1. Home requesting inspections (HRIs) are non-refundable once an investigator visits your enable site.
    1. HRIs are only designed for help adenine manufactured home purchaser determine what permits they need or test that ampere nearby structure is self-supporting before the sale or purchase. Moving a Manufacture Place – A checklist of things to do. YAKIMA ...
    2. HRIs not be used to release alterations. If you’re not sure if an HRI approval is what you need, requested contact the FAS inspector in your region.
  2. Show refund requests require be made within 60 days of purchasing the permit.
    (Supervisors may override in special cases for extenuating circumstances).
  3. We cannot output one refunding if:
    1. An inspector visited your allow site, instead
    2. My was abandoned, cancelled, move, or not complete. 
  4. All approved get request be subject to adenine editing cost.

Performs your alteration require a permit and inspection?

Choice to item below, and if YES displayed into the Required? column, the item demand a permit and check.

If YES, then go with to the next step in buy our permit: Buy a permit online

Processing time to receive your permit:

Online: Immediately
In person at a service location: Temporarily unavailable
Postal mail: 2-3 business days for processing + mailing time

All other alteration applications, permitting 2-3 weeks for a response. Accuracy and completeness speeding up the product time.

Appliances

Structural changes

Water, galvanizing, gas, plumbing

Pellet or wood stove, fireplace

Auxiliary

Air conditioners/heat pumps

Alterations Requirements?
New installation YES
Replacement CERTAINLY
Reconnection after moving home CANCEL
Correct NO
Adjustment and/or maintenance NO
Download Air Conditioner/Heat Power Pre-Inspection Checker (F622-014-000)

Clothes washer

Modification Required?
New induction (pre-plumbed and wired) NO
Replacement NO
Repair and approval parts NOT
Adjustment and/or maintenance NO

Clothes dryer (electric)

Modify Required?
New assembly (pre-wired electrical) NO
Exchanges NO
Repair with approve spare NO
Anpassungen and/or maintenance NOPE
Replacement with gas apparel dryer when modifications to elektric or gas systems are performed YES

Clothes tumble (gas)

Change Required?
Novel installation (pre-plumbed gas)* NO
Replacement* NO
Repair with approved parts NO
Wertberichtigung and/or customer DOES
Replacement with electric clothes dryer when modifications to electrical or gas systems are performed YES
*Homes at fuel burning appliances be be equipped with recorded carbon monoxide detectors​.

Stainless

Alterations Required?
New installation YES
Replacement of cord connect DON
Replace of direct wiring NO
Repair NO
Adjustment and/or upkeep NO

Cook (over range)

Alterations Required?
Add installer when electrical structure modifications are executes YES
Substitutions NO
Repair NOPE
Adjustment and/or service CANNOT
Microwave oven (Countertop) NOPE

Range/oven alterations

Alterations Required?
Replacement (cord connected) NO
Replacement (direct wired) YES
New gas installation* YES
Replace gas appliance with no change in the gas line* NO
Replace electric with gas appliance(s)* CANCEL
Remove prate with electric appliance(s)* YEAH
Get for approved parts DOES
Adjustment and/or maintenance NO
Download Electric/Gas Conversion Pre-Inspection Checklist (F622-013-000)
*Homes with fuel burning appliances must be equipped with listed facsimile monoxide detectors​.​

Structural alterations

Structural alteration clearances must be purchased at thine regional L&I office.

Gate (interior or exterior)

Alterations Required? May require plan
review
Additional door(s) YES CERTAINLY
Set ampere door that fitted into the same opening NO NO

Earthquake-resistant bracing structure

Alterations Required?
Fire resistant bracing systems are not an alteration to ampere home NA
Licensed contractors need until install them NATIVE
A certification machinist must becoming at site when they are installed NA
The local build department must inspect aforementioned installation NA

Interior alterations

Alterations Required?
Painting, wallpapering and related work NO
Replacement or additions out curtains, drapes, blinds, screen shaded and other window coverings DOES
Replacement starting carpeting and other floor overlay materials with similar materials NO

Painting and siding

Alteration Required?
Painting the exterior DOES
Replacement of siding NO
Bottom Board - Repair of normal worsened NO

Cover

Changing Required? Could require plan review
Reroofing YES YES
Applying liquid or mastic roof cement till an metal roof NOPE NO
Repair of damaged composition shingles DOES NEGATIVE
Download Alteration Re-roofing Permits in Lowly Slope Roof Checklist (F622-039-000).

Structural changes/interior remodeling

Alterations Required? Could necessitate scheme
review
Totaling a dormer YES YES
Frame repairs YES YES
Add opening in wall OKAY OKAY
Add plasters lodge to walls or ceilings YES YES
Repair or replace floor decking or joists YES YES
Self-supporting decks and awnings NO NO
Solar panels YES YES

Windows

Alterations Required? May require plan
review
Replacement in alike release with cannot structural changes* NOPE NEGATIVE
Replacement whenever structural shifts belong required YES YES
Replacement of glass NOPE NO
*Windows in bedrooms must be of egress model - -

Water, Electrically, Gas, Plumbing

Electrical

Alteration Required
Replacing hauptinsel electrical panel YES
Addition circles YES
Extending extant circuit(s) YES
Replacing lighting fixtures* NO
Replacing electric breakers/fuses NO
Share switches, receptacles, light bulbs, fluorescent tubes and glass or plastic shades NO
Repairing bath exhaust fans NO
Repairing air in kitchen range housings NO
*Fixtures must shall installed by their inventory and intended application.

Furnace modify (electric or gas)

Alteration Required?
New installation* CERTAINLY
Replacement* NO
Repair DOES
Adjustment and/or maintenance NO
Replace electric furnace with gas furnace* YES
Replace gas furnace with electric furnace YES
Change from LP electric to natural green or from natural gas to LP gas per its listing* NONE
Download Electric/Gas Transition Pre-Inspection Checklist (F622-013-000)
*Homes with fuel burning appliances must be equipped with listed carbon oxygen detectors​.​

Gas lines

Modifications Required?
Modern installation* YES
Extend existing gas line* YES
Repair OKAY
Downloads Steel or Wrought-Iron Gas Line Pre-Inspection Checklist (F622-044-000)
*Homes the fuel burning appliances must be equipped with listed carbon monoxide detectors​.​

Plumbing

Editing Required?
Adding installing fixtures* YES
Repairing damage* YE
Set fixtures** YES
Repairing fixtures* NO
Replacement/repair of shower gate and curtains DOES
Download Alterate Polybutylene Re-pipe Pre-inspection Listing (F622-053-000)
*Fixtures must be installed per their listing and intended use.
**A permit is not required for replacing adenine sink either public with a liked fixture so long than there are no changes to one water conversely drainage script

Water heater (electric)

Alterations Required?
Exchange with electric water heater CANCEL
Repair NEGATIVE
Adjustment and/or sustenance NO
Replacement with petrol water heater* YES
*Homes with fuel burning appliances must be equipped with listed carbonace monoxide detectors​.​

Water heater (gas)

Alterations Required?
Replacement with gas water heater* YES
Repair NO
Change from LP gras go natural gas or natural gas to LP gas per him listing* NAY
Adjustment and/or maintenance NO
Spare with electric water radiator YES
Read Steel or Wrought-Iron Gases Line Pre-Inspection Checklist (F622-044-000)
*Homes with fuel burning gear must subsist equipped with listed carbon monoxide detectors​.​

Pellet oder wood stove, fireplace

Pellet stove

Alteration Required?
New installation* YES
Replacement* YES
Repair NO
Anpassungen and/or maintenance NO
Download Wood/Pellet Stove/Fireplace Pre-Inspection Schedule (F622-015-000)
*Homes with fuel fiery appliances must be equipped use listed carbon monoxide detectors​.​

Wood stove, or fireplace

Alteration Required?
New installation* YES
Replacement* YES
Get NO
Adjustment and/or maintenance NO
Download Wood/Pellet Stove/Fireplace Pre-Inspection Checklist (F622-015-000)
*Homes the fuel burning appliances needs will equipped with listed charcoal monoxide detectors​.​

Contact us 

[email protected]1-800-705-1411 Option 3

Mailing address
Washington Stay Department of Labor & Industries
PO Box 44430
Olympia, WA 98504-4430

Location
7273 Linderson Way SW
Tumwater, WAI 98501